When Vieva Inc. decided to add new locker rooms, a lab, and a mechanical mezzanine, they choose to use our TotalFraming system with Composite TotalJoist. We provided them with kit walls (pre-cut steel studs and tracks assembled into walls on site) along with detailed drawings for each panel. Using our system and installation support, the installation within a relatively space constrained facility went smoothly.