Town Place Suites by Marriott

HotelKanata, ON

Ideal solution for unstable soil conditions

To build this five-storey hotel, the developers had to deal with unstable soils and wanted to minimize the amount of foundation walls because they were using piles. Using our TotalFraming with Composite TotalJoist system, we were able to span the joists from the corridor to the interior walls.

Working with a new installation crew that that had never used our systems, we were able to get the crew comfortable quickly. By the top floors, each floor was down to a nine day turnaround. Follow-up trades were able to start working as soon as the concrete was poured to expedite the schedule.

 

Project Details

Client

Chamberlain Construction Services Limited

Owner

Silver Hotels

Products Used

TotalFraming, Composite TotalJoist

Square Footage

75,700

Number of Storeys

5

Contact

Call or email us if you have questions or would like to discuss a Canadian project.

Contact

For projects in the United States, reach out to one of our value-add resellers.