Located on the shores of Lake Ontario this mid-rise development has won Most Outstanding Mid-Rise in Ontario and Mid-Rise Project of the Year. With luxury in mind, this development is not your typical condominium.
The superstructure of the building is being installed using our TotalFraming system with Composite TotalJoist. All joists come cambered so that no shoring is required on site. This eliminates the labour required to install and uninstall shoring, and also allows for follow-up trades to start working under the floor the day after the pour.
The joist also allow for flexibility for site variations. TotalJoist can handle up to plus or minus 3/4 of an inch tolerance on supporting structure location at each end of the joist. This means that Composite TotalJoist can handle the usual construction variations that happen in reality.